Ok, enough with the silliness and I'll get to a better picture. This would be some rocking i-cord and those awesome buttons.
And this is the whole thing, not too close, to reveal how I got the ferry to cooperate.
Anyways, since then, I have moved on to a new adult-sized project, of kilt hose for me, which even have a deadline, because the theme for Mardi Gras is the Highland Games! And I've been wanting some decent kilt hose for a while now, and it seemed like a good time to do it. I'm knitting them both at the same time on one of those 47" knitpicks needles (3mm) because I want them to be the SAME. Which is all well and good until you realize (like I did, last night) that despite all efforts the calf shaping is in the wrong place, and you have to rip back the last week worth of knitting. To be fair, it was only about 3-4 inches, so not such a big deal, but still. Picking up stitches in the right row was a pain. I'm making these up as I go along, but there might be a pattern at some point, if I can remember to put it together. I am at least writing things down as I go. But, so far, so good. The cables are a little bit close to the front of my leg but that will get better as they move down and the leg gets smaller around.
I think it looks better when actually on a leg, though, as opposed to a fence
Finally, there was a yarn sale at Three Bags Full today. It goes until tomorrow, but they had sock yarn for 50% off (well, some of it). So obviously I had to go this morning. And I got... two balls of Dream in Color Smooshy,
two Dream in Colour Classy,
and then some Cherry Tree Hill Supersock that I paired with Koigu KPM to do Christmas knitting:
The Smooshy is, I think, going to become a hat, and the Classy will be another baby sweater. Maybe a BSJ for Chantelle and Sharp, or maybe something different for Maria. Time to go knit some more :)